During the 3rd week of July, it was our 4th heatwave of the season. It was HOTTTT!!! The workers got a little backed up with inspections of the electric and HVAC units and putting up the internal insulation and drywall. I think it was just too hot to work inside a unit with no circulating air so they concentrated on the outside. The color looks good, I didn't realize it was going to be the same color as the model. I thought it was going to be the light tan color of the adjacent building.
When I went to go visit, we were locked out. The garage, front and back doors were locked. So I had to walk around the building and peer through windows.
Side and back siding is complete! |
Still putting up the opposite end siding |
Finishing up the front siding but also leaving the areas with brick blank. |
| ||
Almost there! Just need to finish siding, add brick, shutters and decorative pieces. |
Peeking through the back window to see what was going on. |
Brick and mortar for the front! |
No comments:
Post a Comment