We took our first walk through and got some neat pictures of what is going on in the inside of the house too.
Workers installing the shingles. |
The front door and sliding doors are installed. The unit next to us has the white trim around the bay window now too. |
The garage is framed out, including the door to the hallway and our two tubs are in boxes on the left. The plumbing PVC pipes and hot/cold pipes are stored in the garage until they are installed. |
Down stairs powder room. You can see the toilet pipe on the back wall. |
Stairs going up with a temporary banister. |
The kitchen, the half wall is where the dishwasher and sink will be. You can see the pantry frame in to the right of the window. The sliding door has a safety "do not cross" piece of wood over it. |
View from the sliding door. |
View from the back of the kitchen towards the living room. |
In the master bedroom looking at the master bath framing on the left (notice the PVC pipe along the wall) and our closet on the right. |
Double sink plumbing which Jason pointed out. |
Looking up to where the rafters are. |
Hall Bathroom. |
Laundry closet and some blue prints. |
View out of a front bedroom window. |
View from our bedroom window. Eventually there will be a row of townhomes there too but I think they won't be done for a while. |
Back of the houses with all the sliding doors up. |