Lots of stuff last week. Everything is trimmed, cabinets are installed, tile is installed and final mechanicals have started.  PSEG installed the electrical meter as well. Looks like we're still on track for a 8/30 moving.

Front walkway

Downstairs Powder Room

Foyer area going into the garage


Downstairs living room

Downstairs sliding door

Boiler




Using the handrails for the first time!




Island sans counters


Jason's glad I got the top crown molding.

Deck off the 2nd floor

Kitchen Pantry
Standard dining room lighting. Not too bad!







2nd bathroom

Upgraded cabinet


One of the bedrooms




Master bathroom with upgraded tiling
Double sink in our bathroom


Close up of tiles

Bathroom floor tiles

We're the only two to have power!


View of the deck from the back