Saturday, June 15, 2013

Still Framing

They are continuing to frame the house and will so through the next week. The rainy weather pushed them back a few days but hopefully they'll be able to gain it back.
Leftover water from that morning's apocalyptic rain storm. The sewers are blocked by orange sandbag like things. Probably to block nails and trash from going down the sewer.

Looks like they put the second floor for every other unit on. I'd guess that somehow they anchor the other units' second floors to the ones that are standing right now.

The top of the stairwell is now covered by the second floor and floor joists.

Zoom in of the stairwell.

Maybe they use that orange belt to hoist up beams instead of walking them up a ladder?



View of the back of the house. We'll have a window on the left and sliding doors on the right for both floors.